Murphy Elite Technical Support
|
All new updates will include the entire chapter, not just the revised pages. This way, you can print out the chapter and replace the old one and be assured of having the most current manual without the risk of losing a step or two between revisions.
Many documents on this page are in PDF format and require the Adobe Acrobat Reader plug-in to view. This plug-in is free and available from Adobe.
| Manual Updates
|
Service Bulletins
|
- Ch. 4 Fin-p2-Parts List Aug 21, 2007
- Ch. 9.9 Fuselage-Fig9.9.5-Step8 Aug 21, 2007
- Ch.15 Control Assembly Exploded View Aug 21, 2007
- Ch. 25 Strut Fairing-p2 Rubber Molding Removed Aug 21, 2007
- Ch. 3 Iso view & parts list bolt size change Fig 3.2.2 Step 2 (2-holes to 3-holes), & Fig 3.7.2 Bolt size change Mar 2, 2006
- Ch. 5 Rudder / parts list Bolt size change Fig 5.1.2 & Fig 5.4.1 Mar 2, 2006
- Ch. 9 Fuselage page 19, para 4 & 10 changed Dec 5, 2002
- Ch. 15 Controls Page 7 changed Dec 1, 2002
- Ch. 8 Wing Assembly, Page 23-29 Fig 8.27.2 & 8.27.3 modified & para 5 of 8.28 deleted Jun 6, 2002
- Ch.10 Spring Gear, Page 1 & 10.1.1 modified (Fig.3.2.2. Bolt Size Change) Jan 1, 2002
- Spring Gear Attach Reinforcement Jan 17, 2002
- Ch. 7 Aileron Assembly, Fig 7.2.6 modified Dec 7, 2001
- Ch. 13 Struts updated Apr 25, 2001
- Ch. Flaps updated Dec 21, 2000
- Ch. Page 10 Updated Sep 29, 2000
- Skylight installation Jun 25, 2002
|
|
|
General Information
|
* In an ongoing effort to maintain the best level of customer service possible, an annual fee of $99.95 is requested from second-hand kit owners who wish to utilize factory technical support services. We thank you for your understanding.
|
|